• Home
  • Electrical Switchboards
  • Testing & Commissioning
  • Engineering Services
  • Contact Us
  • Home
  • Electrical Switchboards
  • Testing & Commissioning
  • Engineering Services
  • Contact Us

  • Home
  • 13 January 2023
  • Electrical Switchboard Manufacturer | Technical Articles

Renewable Energy Zones and High-Voltage Transmission Build-outs

Renewable energy zones demonstrate a move away from project-by-project connections to the grid and instead entail planning at the regional level. Presently, with project-by-project connections, each generator strives to connect to the grid, and REZs come up with areas with abundant renewable energy and design transmission networks to facilitate the transmission of power from various large-scale projects located in these regions. This is because the best spots with respect to wind and solar energy available in the Australian continent tend to be far from the load zones.

In essence, REZs relate to efficiency and certainty. By matching the preferred areas of development and transmission capacity, governments or system developers expect to minimize connection risk and costs in the system. This is an important aspect for those investing in the sense that it is now possible for them to have information about where their investments can be supported in terms of grid connectivity. In the energy system or market, this is expected to minimize congestion, curtailment, or failures in relation to penetration.

The Role of High-Voltage Transmission

High voltage transmission is the key enabler in this respect. The size of the renewable-energy projects can now deliver hundreds of megawatts of power, and several of them in close proximity to the same REZ can match, if not surpass, the production capacity of conventional thermal power plants. If the transmission system is not up to the job, the surplus power will otherwise be stranded. This can mean building long transmission lines with voltages of 330 kV, 500 kV, and even higher, to efficiently transport the power over long distances in Australia’s large geography.

The extent of the challenge is quite large. Many REZs are in the interior and regional zones, whereas the major demand for electricity within Australia is located along the east coast. This has made the transmission component of the challenge one of the most intricate parts of the transition. Building new high voltage lines is a costly and protracted process, as they involve social issues too; nonetheless, they are a necessary component for the fulfillment of renewable energy zone targets.

Planning Transmission for REZs

Transmission planning for REZs takes place well before any new towers are constructed. This starts with a comprehensive system study that takes account of expected growth, the planned retirement of old generators, scenarios for the development of renewables, as well as the capabilities of the existing infrastructure. The planners analyze how new renewables will affect the flow of electrical currents within the infrastructure and pinpoint points that may possibly experience bottlenecks as new renewables are connected to the infrastructure.

One of the most critical and challenging aspects of HV transmission planning is route selection. Essentially, it would seem that the shortest distance between two substations would be the most efficient; real-world constraints make this far more complicated. Transmission corridors have to navigate agricultural land, environmentally sensitive areas, expansion zones of urban/metropolitan areas, and specific regions of cultural significance. In Australia, this includes consultation with landholders and First Nations communities, while increasingly, route optimization has to take into consideration social and environmental factors alongside technical and economic ones.

In general, route optimisation seeks to find the best overall balance between competing priorities. This includes minimising electrical losses and construction costs by engineers and planners, who must also seek to minimise disruption to communities and ecosystems. Geographic information systems and planning software can now evaluate multiple route options against a wide range of criteria, leading to better-informed decisions. This becomes an important factor in REZs, for which transmission corridors may need to accommodate future expansion as additional generation connects over time.

Coordination at State and National Levels

Another important consideration of contemporary REZ planning relates to the coordination of transmission investment at the national and state level. The electricity market in Australia is an interstate market, which means that the impact of a state’s transmission investment can be substantial for other areas of the network.

REZs have seen more involvement of state authorities, acknowledging that commodity markets could prioritize transmission developments to facilitate power transmission, and that infrastructure could not be developed to meet the pace of demands of energy transition. Transmission planning authorities have been formed to ensure consultation processes to determine preferred routes. This is a move to ensure that government authorities plan as they respond to demands of the transition.

National frameworks also have an important role to play. Long-term system planning procedures outline what the future of transmission will look like for the next several decades, rather than several years. Various possible futures and the most important projects that will ensure the reliability of the system in the future, once coal leaves the market and the dominant source of power is from renewables, have all been taken into consideration. REZs have their role in this larger strategy, merely being points for collective investment and not standalone projects.

Case Studies Across Australia

Approaches are now being implemented in practice, and perhaps the clearest example is the Central-West Orana Renewable Energy Zone in New South Wales. As Australia’s first large-scale REZ to reach construction, it neatly illustrates both the opportunities and challenges associated with transmission-led renewable development. The project will see the construction of new 500 kV and 330 kV transmission infrastructure designed to unlock several gigawatts of renewable capacity. By planning this infrastructure upfront, the project seeks to provide a stable connection pathway for multiple generators while reducing congestion and connection delays.

Victoria’s approach provides another insight. It has identified multiple zones across different regions, each with its own resource characteristics and network requirements, rather than a single REZ. This wider framework of planning considers that no single REZ could meet all future demand and that what will be required is a diversified portfolio of renewable regions supported by strong transmission links. The stress on early community engagement and open transparency of planning reflects lessons learnt from earlier transmission projects and the recognition of social licence.

Integration with Storage and Emerging Technologies

With the growing sizes of REZs, transmission planning is gradually incorporating factors that transcend electricity production as alone considerations. The role of electricity storage, involving large battery storage and pumped hydro storage, is expected to play an increasingly important role in shaping transmission demands and usage patterns. Demand-side engagements are already on the radar, especially due to transportation and industrial sector electrification patterns that must be accommodated by new transmission planning methodologies.

Yet another emerging issue that has come to the fore is the correlation between REZs and other energy infrastructure, which includes hydrogen production plants. There are some areas where renewable energy will be deployed not only to feed the national grid but also to support the energy-intensive industries established close to REZs.

Challenges and Opportunities

Despite the evident merits of REZ-based planning, there are risks and concerns to overcome. Transmission projects involving high voltage tend to pose more controversies, and this is more evident when the areas involved are those where the population perceives that the advantages of renewable energy generation go to other regions and the costs are shouldered by their own locations.

Timeframes are another area of great importance. The rate of renewable evolution accelerates, thanks to targets and the fall in technology prices, whereas the planning and implementation of transmission infrastructure takes place over many years. Coordination of the two remains one of the biggest challenges. In the case of transmission network development lagging behind generation, the consequences would be the rise of congestions and curtailments. Alternatively, transmission development well ahead of generation would result in increased cost without any corresponding benefit.

In terms of value-for-money as an investment, the REZs and the related HV build-outs are among the largest infrastructure projects undertaken by Australia in many years. In regard to making sure that the value derived in this regard is maximized, the new directions in regard to competitive procurement and government ownership represent an effort to mitigate risk and ensure better consumer outcomes.

We design and manufacture high-quality switchboards. Contact us today to discuss your requirements and get started!

Tags: High & Medium Voltage
Electrical Switchboard Manufacturer
  • BESS & Batteries
  • Electric Vehicles & EV Charging Switchboards
  • Electrical Enclosures
  • Engineering Resources
  • High & Medium Voltage
  • Integrating Diesel & Backup Generation
  • Power Quality Analysis
  • Protection Relays & Injection Testing
  • Renewable Energy & Power Generation
  • Solar Standards: AS/NZS 4777 2024
  • Switchboards & Components
  • Virtual Power Plants & Smart Grids
  • Wiring Rules AS/NZS 3000
  • electrical switchboard | electrical switchboards
    What is Edge Computing? How it helps power distribution?
    Edge computing refers to an arrangement where data processing occurs… Read more: What is Edge Computing? How it helps power distribution?
  • electrical switchboard | electrical switchboards
    What is Net Zero Building? How it uses Smart Switchboards?
    Net Zero building is designed in a way that allows… Read more: What is Net Zero Building? How it uses Smart Switchboards?
  • electrical switchboard | electrical switchboards
    What is Paralleling Switchgear? How it works?
    Paralleling switchgear is basically a low-voltage switchboard used to control… Read more: What is Paralleling Switchgear? How it works?
  • electrical switchboard | electrical switchboards
    What is Electrification? Understanding the Basics
    Electrification is turning into one of the major trends in… Read more: What is Electrification? Understanding the Basics
  • What is a Data Center?
    What Is a Data Center? Discover How it works!
    DATA CENTER – Each day, we use the internet and… Read more: What Is a Data Center? Discover How it works!
  • 250A Chassis
    Understanding a 250A Chassis in a Distribution Board
    A 250A chassis is an example of a type of… Read more: Understanding a 250A Chassis in a Distribution Board
  • arc flash protection
    Arc Flash Protection – What Really Happens When Systems Fail
    The technician didn’t hear anything unusual. No alarm. No warning.… Read more: Arc Flash Protection – What Really Happens When Systems Fail
  • Do All Switchboards Require a Dedicated Room?
    Do All Switchboards Require a Dedicated Room?
    Switchboards are usually mounted on a garage wall, sometimes in… Read more: Do All Switchboards Require a Dedicated Room?
  • Is SMA leaving the Australian market?
    Why is SMA shutting down in Australia? Explained!
    Is SMA really going to close down? SMA’s move in… Read more: Why is SMA shutting down in Australia? Explained!
  • electrical switchboard | electrical switchboards
    What Are Electronic Overload Relays? Explained!
    Electronic overload relay sends a signal to the contactor to… Read more: What Are Electronic Overload Relays? Explained!
  • electrical switchboard | electrical switchboards
    AS/NZS 3000 Switchboard Rules – Complete Guide for Compliance and Safety
    Switchboard rules is critical for ensuring electrical safety and functionality.… Read more: AS/NZS 3000 Switchboard Rules – Complete Guide for Compliance and Safety
  • electrical switchboard | electrical switchboards
    AS/NZS 3000 Switchboard Clearances: Safety Rules Every Electrician Must Know
    Ensuring proper switchboard clearances is crucial for maintaining safety and… Read more: AS/NZS 3000 Switchboard Clearances: Safety Rules Every Electrician Must Know

Contact Us

Phone: 02 9558 2480

Email: contact@cleantechcontrols.com.au

Sales (VIC) 0435 812 094

Sales (NSW) 0405 352 840

Sales (WA) 0419 423 609

Useful Links

  • Home
  • Electrical Switchboards
  • Injection Testing & PQA
  • Engineering Services
  • Technical Articles
  • About Us
  • Contact Us
© 2020 Clean Technology Controls. All Rights Reserved.