Client: Powerwell Scope: Site Inspection, AC Schematics, Protection Schematics, Injection Testing, Grid Protection Switchboard Timeframe: Feb 2020 to May 2020 Project Goals: To provide engineering services and grid protection switchboard for a 75kW solar project. Project Challenges: To deliver a project during Covid-19 Project...
Client: Sun Connect Scope: Grid application (Ausnet) Construction drawings Protection Switchboard Supply and Commissioning. Timeframe: Preliminary Phase: 11/2016 – 03/2017 Design Phase: 04/2017 – 10/2017 Construction Phase: 11/17 – 04/18 System Commissioning: 04/18-05/18 Project Goals: To install the second stage of Nature’s Organics’ 1.3MW...
Client: Australian Lamb Colac Scope: AC System Design / DC Configuration Design / Grid Connection Approval with Powercor / Supply of Protection Equipment. Timeframe: Preliminary Phase: Jan 2017 – Mar 2017 Design Phase: May 2017 – Sept 2017 Construction Phase: July 2017 – Feb...
Client: Energy Aware Scope: Preliminary Design, Detailed Design, Grid application Construction drawings, As-built drawings Supply Protection Equipment Supply and Integration of Powercor SCADA equipment Timeframe: Preliminary Phase: Sept 2015 Design Phase: March 2016 – September 2016 Construction Phase: July 2016 – March 2017 System...